Click Here To Know More About:
ICGB PDF Download
by
Adila Masih
Version: 8.0
Question: 1
The use of station warning lights, tool boards and jidohka devices in the application of Lean accomplish which of these principles?
A. Pilferage Minimization
B. Visual Factory
C. Management Awareness
D. Operator Attentiveness
Answer: B
Question: 2
A Lean Principle that addresses efficiency by the process worker is called ____________________?
A. Visual Factory
B. Supervising
C. Training
D. Standardizing
Answer: D
Question: 3
While management of a company must set the stage for all improvement efforts, which of these 5Ss is primarily driven by management?
A. Straighten
B. Sort
C. Shine
D. Sustain
Answer: D
Question: 4
As part of a Visual Factory plan __________ cards are created and utilized to identify areas in need of cleaning and organization.
A. Kanban
B. Kaizen
C. Poke-Yoke
D. WhoSai
Answer: A
Question: 5
The use of Kanbans work best with pull systems for determining the timing of which products or services are produced.
A. True
B. False
Answer: A
Question: 6
When a Belt applies the practice of Poka-Yoke to a project challenge she is attempting to make certain the activity is _______________ .
A. Well documented
B. Removed from the line
C. Mistake proofed
D. Highly visible
Answer: C
Question: 7
The Lean Principle action in the 5S approach that deals with having those items needed regularly at hand and those items need less regularly stored out of the way is known as ___________.
A. Shining
B. Standardizing
C. Sustaining
D. Sorting
Answer: D
Question: 8
SPC on the outputs is more preferred than SPC on the inputs when implementing SPC for your process.
A. True
B. False
Answer: B
Question: 9
Significant variation in process performance is a consequence of several causes that can be classified using which of the terminologies shown. (Note: There are 2 correct answers).
A. Common
B. Random
C. Uneducated
D. Special
E. Vital
Answer: A,D
Question: 10
When it comes to Control one of the most effective means of eliminating defects is to _________________ .
A. Train personnel often and thoroughly
B. Keep a Six Sigma project going on the process at all times
C. Design defect prevention into the product
D. Have each process consist of no more than five steps
Answer: C
Question: 11
A periodic time frame can be used to arrange for Control Limit and Center Line calculations with good SPC implementation in a process.
A. True
B. False
Answer: A
Question: 12
The data on SPC charts are typically constructed such that they have the most recent data point on the right hand side.
A. True
B. False
Answer: A
Question: 13
Which statement(s) describe an undesirable situation when implementing SPC?
A. The lower Control Limit for the R chart is equal to zero
B. Attempt to use SPC for tracking transaction times at a warehouse
C. A process is in Statistical Control before implementation of SPC
D. The Control Limits are wider than the customer specification limits
Answer: D
Question: 14
If a process has Outliers which pair of charts is most preferable if subgroups will exist for the Continuous Data?
A. Individual”Moving Range
B. Xbar-R Charts
C. Xbar-S Charts
D. nP and P Charts
Answer: B
Question: 15
After a Belt has put data through the smoothing process which chart would be used to look for trends in the data?
A. Moving Average Chart
B. Multi-Vari Chart
C. X bar Chart
D. Pareto Chart
Answer: A
Question: 16
This output is what type of advanced Capability Analysis?
A. Continuous
B. Binomial
C. Poisson
D. Discreet
E. DPU
Answer: B
Test Information:Total Questions: 200Test Number: ICGBVendor Name: IASSCCert Name: Lean Six Sigma Green BeltTest Name: IASSC Certified Lean Six Sigma Black BeltOfficial Site: http://directcertify.comFor More Details: http://www.directcertify.co.uk/ICGB.html
Article Source:
eArticlesOnline.com}